Baltazar Contractors, Inc. is certified with the Massachusetts and Connecticut Department Transportation to construct new prosed roadways drives as well as reconstruct and rehabilitate existing roadways.  Baltazar provides traffic controls, clearing, demolition, excavation, backfill, utilities, conduit, paving, concrete, granite and asphalt curbing, concrete and asphalt sidewalks, signs, pavement markings, landscaping and restoration activities, including management of traffic signal and street light installation, guardrails and fencing operations.

Lee, MA - Roadway Reconstruction

Lee, MA

Roadway Reconstruction and Related Work along a Section of Tyringham Road in the Town of Lee, Massachusetts

Scope of Services:

The work on this project consists of the reconstruction of approximately 9,789.87 feet (1.854 miles) of Tyringham Road in the Town of Lee, Massachusetts. Construction will include pavement reclamation with a few sections of full-depth reconstruction from the southerly limit at the Lee/Tyringham Town Line northerly to the Goose Pond Brook Bridge. The roadway pavement section will be widened to a uniform width of 22 feet and all work will be generally performed within the existing right-of-way. Drainage improvements include the replacement of existing drop inlets, cross culverts and stone for pipe ends outlet protection. The construction of eighteen gabion retaining walls will provide slope stabilization for new guardrail installation and construction of a drainage swale along the easterly side of the roadway. Improvements will include the reconstruction of the intersection of Tyringham Road and Meadow Street.

lee

Florida, MA - Roadway Reconstruction

Florida, MA

Roadway Reconstruction and Related Work on a Section of River Road Florida, Massachusetts

Owner: Massachusetts Department of Transportation

Construction Schedule: 2010

Scope of Services: The work under this project consists of the reconstruction of River Road in Florida, Massachusetts from the intersection with Whitcomb Hill Road continuing southerly a distance of approximately 1.64 kilometers. The proposed work consists of excavation by cold planer, bituminous concrete overlay, earth excavation, full depth bituminous concrete pavement construction, drainage system improvements, bituminous concrete berm construction, bituminous concrete and gravel driveway construction, highway guard installation, pavement markings, signing, landscaping, and other incidental items necessary to complete the work.

Palmer, MA - Roadway Reconstruction

Palmer, MA

Roadway Reconstruction and Related Work on a Section of Springfield Street
Palmer, Massachusetts

Owner: Massachusetts Department of Transportation

Construction Schedule: 2010 – 2012

Scope of Work: The work under this Contract consists of the reconstruction of two segments of the Springfield Street corridor in Palmer, Massachusetts. The first segment includes Springfield Street from the Wilbraham Town Line to New Hampshire Avenue, a distance of approximately 2,000 meters. The second segment includes the intersection formed by Main Street, Springfield Street, and Bridge Street. The proposed work consists of excavation by cold planer, hot mix asphalt overlay, earth excavation, full depth hot mix asphalt pavement construction, pavement reclamation, drainage system improvements, hot mix asphalt berm installation, sidewalk and wheelchair ramp construction, granite curb installation, hot mix asphalt and gravel driveway construction, waterline replacement, abandoned track removal, pavement markings, signing, landscaping, and other incidental items necessary to complete the required work.

Palmerproj

Amherst, MA - Roadway Reconstruction

Amherst, MA

Roadway Reconstruction and Related Work on a Section of West Street (Route 116) Amherst, Massachusetts

Owner: Massachusetts Department of Transportation

Construction Schedule: 2011-2013

Scope of Services: The work under this project consists of cold planning and resurfacing roadways, full depth reconstruction, removing and stacking or resetting existing granite curb, installation of new granite curb, construction of sidewalks, drainage improvements, construction of driveway aprons, wetland replication, loaming and seeding, installation of signs and pavement markings, safety signing for construction operations and all other incidental items necessary to complete the work.

The work also includes construction of a multi-use path with two pavement sections: a dense graded pavement and a porous pavement section.