Palmer, MA Roadway Reconstruction

Roadway Reconstruction and Related Work on a Section of Springfield Street
Palmer, Massachusetts

Owner: Massachusetts Department of Transportation

Construction Schedule: 2010 – 2012

Scope of Work: The work under this Contract consists of the reconstruction of two segments of the Springfield Street corridor in Palmer, Massachusetts. The first segment includes Springfield Street from the Wilbraham Town Line to New Hampshire Avenue, a distance of approximately 2,000 meters. The second segment includes the intersection formed by Main Street, Springfield Street, and Bridge Street. The proposed work consists of excavation by cold planer, hot mix asphalt overlay, earth excavation, full depth hot mix asphalt pavement construction, pavement reclamation, drainage system improvements, hot mix asphalt berm installation, sidewalk and wheelchair ramp construction, granite curb installation, hot mix asphalt and gravel driveway construction, waterline replacement, abandoned track removal, pavement markings, signing, landscaping, and other incidental items necessary to complete the required work.