Hartford, CT Sewer, Water, Storm and Utilities

BURTON STREET DRAIN SEPARATION PROJECT – Contract 2002-25A

MDC

Owner: The Metropolitan District
-The Clean Water Project

Construction Schedule: 2010 – 2012

Scope of Services: The Burton Street Separation Project involves the replacement of approximately 4,150 linear feet of 8-inch ductile iron water main, the installation of approximately 1,810 linear feet of 12-inch PVC drain pipe, the installation of approximately 140 linear feet of 12-inch ductile iron drain pipe, the installation of approximately 280 linear feet of 15-inch PVC drain pipe, the installation of approximately 4,470 linear feet of 6-inch PVC drain laterals, the installation of approximately 2,015 linear feet of 8-inch PVC sanitary sewer main, the installation of approximately 435 linear feet of 10-inch PVC sanitary sewer main, the installation of approximately 645 linear feet of 12-inch PVC sanitary sewer main, the installation of approximately 5,180 linear feet of 6-inch PVC sewer laterals, the interior replumbing of approximately 82 residential homes, roof leader separations of approximately 45 homes and sewer pipe rehabilitation for approximately 1,895 linear feet as well as point repairs and repair of protruding services. The Project also includes pavement repair, sidewalk replacement, and the milling and overlay of Sigourney Street, Burton Street, Magnolia Street and Irving Street from Albany Avenue to Homestead Avenue located in the City of Hartford, Connecticut.

Links: http://thecleanwaterproject.com/